Migration Process
Comprehensive guide to deployment and migration procedures for the Integrate Pasifika platform. Production deployment scripts, database backup procedures, and environment management.
Production Ready
Comprehensive deployment scripts with full validation, backup procedures, and rollback capabilities.
Data Safe
Automated backup procedures ensure data safety during deployments with multiple recovery options.
Flexible
Multiple deployment options from comprehensive validation to quick emergency deployments.
Deployment Scripts
Choose the right deployment strategy for your needs
Comprehensive Deployment
Most robust deployment script with all fixes and optimizations
Features
- TypeScript compilation with memory optimization (8GB heap)
- Prisma schema validation and client generation
- Docker networking fixes and container management
- PostgreSQL backup automation
- Rollback capabilities with timestamp-based deployments
- Environment validation and health checks
Use Case
Production deployments with full validation
scripts/production-deploy-comprehensive.sh
Enhanced Deployment
Enhanced deployment with backup protection and data safety
Features
- Pre-deployment database backup
- Enhanced backup protection with failure handling
- Comprehensive package creation with all dependencies
- Server-side backup infrastructure setup
- Data migration safety checks
- Environment-specific configuration management
Use Case
Production deployments with data safety focus
deploy/production-deploy-enhanced.sh
Quick Deployment
Quick deployment without TypeScript validation
Features
- Skips TypeScript compilation for faster deployment
- Basic Prisma schema validation only
- Memory-optimized build process
- Build output verification
- Minimal validation for emergency deployments
Use Case
Emergency deployments or when TypeScript errors exist
scripts/no-type-check-deploy.sh
Deployment Phases
Step-by-step deployment process with time estimates
Pre-Deployment
3-5 minutes- 1TypeScript compilation validation (if applicable)
- 2Prisma schema validation
- 3Local backup creation
- 4Dependency installation and verification
- 5Environment configuration validation
Build Process
5-8 minutes- 1Clean previous builds
- 2Install production dependencies
- 3Generate Prisma client
- 4Build Next.js application
- 5Create deployment package
Server Deployment
5-10 minutes- 1Create timestamped deployment directory
- 2Upload deployment package
- 3Extract and configure application
- 4Database migration and backup
- 5Container deployment and health checks
Post-Deployment
2-3 minutes- 1Health check verification
- 2Database connection testing
- 3Application functionality testing
- 4Performance monitoring setup
- 5Backup verification and cleanup
Backup Procedures
Comprehensive backup strategies for data safety
Database Backup
PostgreSQL database backup before deployment
- Create timestamped backup directory
- Export database schema and data
- Compress backup files
- Verify backup integrity
- Store in secure backup location
Application Backup
Current application state backup
- Archive current deployment directory
- Backup configuration files
- Export environment variables
- Document current state
- Create rollback package
Configuration Backup
Environment and configuration backup
- Backup .env files
- Export Docker configurations
- Document network settings
- Backup SSL certificates
- Archive custom configurations
Rollback Procedures
Emergency procedures for different failure scenarios
Application Failure
- 1Stop current application containers
- 2Restore previous deployment directory
- 3Restart application with previous version
- 4Verify application health
- 5Update DNS/load balancer if needed
Database Issues
- 1Stop application to prevent data corruption
- 2Restore database from backup
- 3Verify data integrity
- 4Restart application
- 5Monitor for data consistency
Configuration Problems
- 1Identify problematic configuration
- 2Restore configuration from backup
- 3Restart affected services
- 4Verify configuration changes
- 5Monitor application behavior
Best Practices
Guidelines for successful deployments
Before Deployment
- • Always create backups before deployment
- • Test deployment scripts in staging environment
- • Verify all dependencies are up to date
- • Check database migration scripts
- • Ensure sufficient disk space and memory
During Deployment
- • Monitor deployment logs in real-time
- • Verify each phase completes successfully
- • Test application health after deployment
- • Keep rollback procedures ready
- • Document any issues encountered
After Deployment
- • Verify all services are running correctly
- • Test critical application functionality
- • Monitor performance metrics
- • Update documentation if needed
- • Clean up old deployment artifacts
Emergency Procedures
- • Use quick deployment for emergencies
- • Have rollback procedures documented
- • Keep backup contact information ready
- • Document incident response procedures
- • Test emergency procedures regularly